Utility-Scale PV
Greenfield and late-stage development sites of 20–200 MWp across DE, IT, ES, PL, and NL. Fixed-tilt and single-axis tracker systems with Tier-1 modules.
Division 02 · Flagship
ARETEUM Infrastructure invests its own capital in utility-scale photovoltaics and industrial battery storage. We are a principal investor — not a fund manager — and we underwrite every project on our own balance sheet. Our current flagship project in central Germany combines a PV system above 1 MWp with a 4,072 kWh / 1,500 kW grid-connected battery, scheduled for commissioning in 2026.
Current flagship project · Central Germany · COD 2026
PV capacity
BESS gross capacity
Nominal power
Expected yield p.a.
Commissioning
Asset lifespan
§ I — Investment Lifecycle
Most energy-transition platforms specialise in a single stage. ARETEUM Infrastructure operates the full lifecycle in-house — which is how we control quality, cost basis, and the alignment of cash flows with investor capital.
Proprietary site sourcing, grid-capacity screening, zoning pre-checks, and commercial option structuring with landowners and municipalities.
Ø 6–12 months
Project-level SPV setup, debt/equity architecture, PPA and offtake negotiation, regulatory approvals, and fund/club-deal structuring under Lux or German vehicles.
Ø 9–18 months
EPC tendering, construction oversight, commissioning, and grid connection. Tier-1 component policy; fixed-price, date-certain contractors only.
Ø 9–14 months
Technical and commercial asset management, performance monitoring, merchant-price hedging, and quarterly investor reporting for the full 25-year operating horizon.
20–25 years
§ II — Asset Classes
Greenfield and late-stage development sites of 20–200 MWp across DE, IT, ES, PL, and NL. Fixed-tilt and single-axis tracker systems with Tier-1 modules.
Grid-connected battery energy storage systems (BESS), 10–200 MWh, co-located or standalone. Revenue stack: ancillary services, arbitrage, capacity markets.
Co-located PV + BESS assets sharing grid connection, O&M and SCADA. Structurally higher utilisation and superior merchant resilience.
Dual-use arrays over permanent crops and grazing land — delivering agricultural yield and electricity from the same hectare.
Corporate power-purchase agreements of 8–15 years with investment-grade offtakers, de-risking merchant exposure.
Floating PV, rewetted-peatland systems, and sealed-surface installations (car parks, logistics roofs).
§ III — Flagship Project
Asset 01 · PV Generation
Asset 02 · Battery Storage
Hybrid Operation
Figures reflect current technical planning and are subject to final grid-connection authorisation and EPC contract. All capital is deployed from ARETEUM own funds. The project is not a financial product and is not offered to external investors.
§ IV — EU ESG Alignment
§ V — Frequently Asked
§ VI — Partnership & enquiries
We are not seeking external investors. If you own a site, represent a municipality, operate as an EPC or O&M partner, or have a concrete strategic proposal — this is the right channel. Other enquiries will be redirected.